.


                                                                           Trident Energy Power Plant

The name Trident was selected by the inventors of the process used by the Trident Energy Power Plant. The
technology as it symbolizes “Tri” meaning “three” as this system uses three levels of renewable resources in
the application.
Although the actual properties are water and sun, through these two agents another is born. Steam!

Sun and water resources have been the cornerstone of technology since the beginning of time and have been
effective although rudimentary in application for energy generation for hundreds of years. Even today when
each resource is used independently it does not maximize the potential of energy that can be generated, nor
remove all environmental impacts.

The Trident technology, process and application using renewable resources has developed a solution by taking
both the positive and negative aspects of each resource, in merging them into a collective design and separate
qualities. Environmental free, independent of dams, rivers, lakes or ecological impacts of any kind to habitats.
The Trident Energy Power Plant and the 21st Century will revolutionize the power industry worldwide.

The searching of creating is found within oneself. The vision of combining the three most powerful forces in
the world, providing unlimited amounts of energy once visualized and connected together, form an energy
system that is in harmony with our world.

The base 5,200 m w Trident Energy Power Plant will cost $3,
860,646,846.

Trident Energy Power is currently looking for a loan of 3.9 billion dollars to build a 5,200 mw power plant that
uses no fossil fuels or nuclear power. I have a group of people that will supply as additional collateral to lender a
top 25 Bank Guarantee for the entire loan amount. Lender would keep a interest in the project until loan is paid
off and as additional collateral would have a BG to guarantee repayment of the loan. Loan would be paid off in 1
year and 1 month.

What interest rate do you receive in return? Simple. How much do you want? You name the amount you want
in return for your investment and if it is compatible with our funding specialist, you will receive it. We do have
the right to refuse funding that exceeds our rate of return.
.
To interested parties: Contact information is:
Email:tridentenergy@aol.com

Phone number 512-576-2499


Trident Energy Power will now build two (2) power plants at the same time. One in Texas and the other in
Georgia.

Are intention is to produce over 104 gigawatt's of electricity each day. The
expanded Trident Energy Power
Plant is capable of doing so.

It should be noted that a megawatt of electricity is equivalent of providing electricity for about 6,400
households. A gigawatt is 100 megawatts.


It should be noted that a 1,500-mw Nuclear power plant costs between 4 and 6 billion dollars to build with added
costs of storage of nuclear material.

Respectfully Yours,

Gordon L. Head
Inventor/Engineer/Consultant/Senior Vice-President
Our World Cannot Be Replaced
Austin , Tx
Trident Energy Power